west park nitra

industrial & logistic park in the heart of europe


Accessibility

West Park Nitra (WPN) is located 1,2 km from R1 speedway exit Luzianky, an area situated 5 km from the city centre and 4 km from Jaguar Land Rover car plant.

The R1 connects Western and Middle Slovakia and meets D1 highway at the exit Trnava.

WPN has also a direct access to a II. class road linking Nitra and Hlohovec.

Location

WPN is a part of dynamically developing area consisting of retail warehouse, cash&carry, light production and headquarter schemes. The total area of West Park Nitra is 60,6 ha. The land plots are owned by CD REALITY, s.r.o. and TATRA PROPERTY, a.s., both controlled by a single owner.

All land plots have been extracted from the Slovak Land Fund and have obtained both EIA and Planning permit.

accessibility

the technical infrastructure

the current mains and the ways of connection


Traffic junction

connected to the roundabout implemented on the road No. II/513 Hlohovec – Nitra / Vinárska cesta – WPN Including the translocation of all the infrastructure and service connections


Show bigger picture

Electric energy

- reserved capacity of 8 MWh
- underground electric lines
- max. NAYY-J4x240 cable included in standard, updgrade possible


Show bigger picture

Gas

High pressure gas line & Medium pressure gas line


Show bigger picture

Drinking water

Connection DN 200


Show bigger picture

Rainwater sewer

Rainwater can be drained into the Kajsiansky channel
- total capacity up to 150 l/s, with retention-tank


Show bigger picture

Sanity sewer

with connection to the municipal sewer


Show bigger picture

zonation

note: plots can be customized


 
A1/1 - area for RETAIL 20.000 sq.m.
 
A1/2 - area for RETAIL 20.000 sq.m.
 
A1/3-A1/5 - areas for RETAIL are available from 5.000 sq.m. to 27.000 sq.m.
 
A3 - area 31.044 sq.m.
 
B1/1B - area 15.346 sq.m.
 
B2/2B - area 7.547 sq.m.
 
D1-D3 - areas from 10.000 sq.m. to 55.000 sq.m.
 
F1-F8 - areas from 5.000 sq.m. to 150.000 sq.m.

Industrial park

29. september 2022
main access roads finished, first companies in full production, others in building phase

Retail park

19. februára 2024

Get in touch

We look forward for your message.